ENMAKSAN POWER / Parallel generation & power management

Synchronization Systems.
Multiple generators.
One coordinated system.

Bring generation, switching and control together. Explore generator synchronisation and load-sharing solutions built around your electrical network, operating modes and continuity requirements.

ENMAKSAN POWER generator synchronization system
Illustrative system. Equipment, control functions and operating modes are confirmed for each project.
Coordinated generationCompatible generators operating in parallel
Managed load sharingActive and reactive power coordination
Defined operating modesControls aligned with the network design
01 / Think in systems

More than connecting
generators together.

Parallel generation brings capacity, control and protection into one engineering plan.

ENMAKSAN POWER provides generator synchronisation and power management solutions for industrial, commercial and infrastructure applications. Compatible generating units can operate on a common bus and share demand through an agreed control strategy.

The design starts with the single-line diagram and the required operating modes. Generator-to-generator operation, utility paralleling and automatic transfer each introduce different switching, protection and approval requirements.

Synchronisation supports coordinated operation. Continuity of supply still depends on the complete architecture, available capacity and the type of disturbance.
ENMAKSAN POWER synchronization systems illustration
Generation, switchgear and controls reviewed as one electrical system.
02 / How synchronisation works

Match. Connect.
Share the load.

A simplified overview of connecting a generator to an energised bus. Actual sequences and acceptance conditions are project-specific.

01 — Prepare & match

The selected generator starts. Compatible controls bring voltage and frequency toward the bus conditions and verify phase relationships.

02 — Verify & connect

Synchronism checks, breaker feedback and interlocks confirm the permitted conditions before the generator breaker is commanded to close.

03 — Share & supervise

Controls coordinate active and reactive loading while monitoring the system and responding to demand changes or protective events.

03 / Operating configurations

Choose the mode.
Define the control strategy.

PARALLEL GENERATION

Generator to generator

Compatible units supply a common bus. The control strategy defines load sharing, capacity management and the response to a unit becoming unavailable.

UTILITY INTERFACE

Generator to grid

Generators operate in parallel with the utility under an approved connection arrangement, with specified protection and import/export limits.

OPERATOR INTERFACE

Automatic or supervised

Define automatic, semi-automatic or manual operating responsibilities while preserving the required checks, interlocks and protection.

04 / Applications

Power management
around real demand.

Potential applications to assess against the load profile and required continuity of service.

01 / INDUSTRY

Industrial facilities

Coordinate multiple generating units around production demand, large load steps and essential process utilities.

02 / DIGITAL INFRASTRUCTURE

Data centres

Review generator capacity and restoration sequences alongside UPS systems and the defined redundancy strategy.

03 / HEALTHCARE

Hospitals & campuses

Coordinate generating capacity with critical distribution and the required transfer times for each load group.

04 / LARGE SITES

Commercial campuses

Plan central generation for multiple buildings with load priorities and coordinated switching.

05 / REMOTE POWER

Isolated networks

Assess parallel generation where no reliable utility connection exists and loads vary throughout the operating day.

06 / ENERGY MANAGEMENT

Approved grid-parallel projects

Evaluate peak management or controlled transfer where technically appropriate and permitted by the network operator.

05 / Engineering details

Define the logic.
Coordinate the interfaces.

A clear specification aligns generators, switchgear, protection and supervisory controls before implementation.

Network architecture & operating modes

Define the single-line diagram, bus arrangement, generator ratings and required operating modes. Identify island operation, generator-to-generator paralleling and any utility-parallel operation separately. Specify the intended response to utility loss, generator faults and restoration of the normal supply.

Synchronisation & breaker control

The incoming generator must meet the required voltage, frequency and phase conditions before connection to an energised bus. Phase sequence, synchronism checking, breaker status feedback and electrical interlocks form part of the coordinated design. Dead-bus energisation requires a separate controlled sequence.

Active & reactive load sharing

Active power sharing is coordinated through compatible engine governing controls; reactive power sharing depends on compatible excitation and voltage regulation. Define proportional loading, power-factor or reactive-power control requirements for each operating mode. Different unit sizes require an agreed sharing strategy.

Protection & fault coordination

Review fault levels, breaker duties, instrument transformers, earthing and the protection philosophy. Evaluate generator and network protection against the proposed topology. Settings, selectivity and utility interface protection require project-specific studies and commissioning by the responsible specialists.

Capacity management & load priorities

Specify which loads are essential, which can be shed and the sequence for restoring them. Define the reserve capacity, start/stop strategy and minimum operating conditions. Redundancy must account for the available generating capacity, common equipment and the loads that must remain supplied.

Controller compatibility & communications

Confirm interfaces between generator controllers, governors, automatic voltage regulators, switchgear and the supervisory system. Agree communication protocols, alarm lists, status signals and operator access. Existing equipment compatibility must be checked before promising a retrofit or mixed-brand installation.

Testing, commissioning & documentation

Agree factory and site acceptance tests covering synchronisation, load sharing, breaker interlocks, load shedding and responses to faults or communication loss. Define utility witness requirements where applicable. Request approved diagrams, control descriptions, settings records, test results and operator documentation.

06 / From diagram to defined scope

Start with the network.

  1. Share the architecture

    Provide the single-line diagram, generator data and existing control equipment.

  2. Define the behaviour

    Specify operating modes, load priorities, redundancy and restoration requirements.

  3. Review compatibility

    Confirm control interfaces, switchgear, protection and utility requirements.

  4. Agree acceptance

    Define the supply scope, functional tests, commissioning and handover records.

07 / Questions answered

Parallel power.
Clear answers.

Understand the architecture before selecting the control solution.

What is a generator synchronization system?

It is a coordinated control and switching arrangement that enables compatible generators to connect in parallel. Before connection to an energised bus, it checks the required electrical conditions. After connection, the system manages operation and load sharing according to the agreed control strategy.

Can generators with different power ratings run together?

They may be able to, provided their electrical characteristics, controls and protection are compatible. Load sharing should reflect the rated capacity and operating limits of each unit. Compatibility requires an engineering review; different ratings alone do not establish suitability.

Can generators operate in parallel with the utility?

Yes, where the installation is designed for that operating mode and the utility approves the connection. Interface protection, metering, switching and import or export limits must meet the applicable requirements. Grid paralleling is not automatically included in every synchronisation system.

Does synchronization guarantee uninterrupted power?

No. Transfer continuity depends on the network topology, controls, available generation and the type of disturbance. Synchronisation alone does not replace a UPS. Define allowable interruption times and any ride-through requirements for critical loads.

Can an existing generator installation be upgraded?

A retrofit may be possible after reviewing the generators, controllers, governors, voltage regulators, breakers and protection. Existing equipment condition, communication interfaces and required operating modes determine the practical scope.

What information is needed for a proposal?

Provide the single-line diagram, generator ratings, controller details, voltage, frequency, load profile and required operating modes. Include utility connection requirements, redundancy objectives, load priorities and the proposed installation location.

Your next power management project

Let’s coordinate
your power system.

Share your network diagram and operating requirements with ENMAKSAN POWER to discuss a project-specific synchronisation solution.

Network & generatorsSingle-line diagram · Ratings · Voltage · Frequency
Existing equipmentControllers · Governors · Voltage regulators · Switchgear
Operating strategyParallel modes · Load priorities · Redundancy · Utility interface
Project scopeMonitoring · Protection · Testing · Commissioning
WhatsApp Support Call Us